District Heating Simulation Heat Fluid Laboratory
home What we do R&D Research Facilities District Heating Simulation Heat Fluid Laboratory
- District Heating Simulation Thermal Fluid Laboratory
Key research facilities
- (District heating water simulation equipment) Warm/Hot water (high temperature, high pressure) simulation thermal fluid test device
- (User's circulating water simulation equipment) User's heating water simulation thermal fluid test device
- (Parallel pumps optimal control system) Test device for optimal operation of multiple pumps
- (Crack tip opening displacement test equipment) Test device for the evaluation of cryogenic breakdown characteristics
- (Hydrogen-based cracking test equipment) Test device for hydrogen-based crack evaluation
- (Stress Corrosion Cracking Test Equipment) Test device for evaluation of stress corrosion cracking according to the environment
History
- (2016.11) Signed an MOU with Swedish RISE (formerly SP Laboratory)
- (2017.09) Signed an MOU with the Korea Conformity Laboratories
- (2018.08) Started construction of the Heat Transport Pipe Performance Test Center
- (2019.12) Installed dedicated testing devices for heat transport pipe and opened the center